Shouhang Dunhuang 100 MW Phase II

Status Date

Background

Technology
Power Tower
Status
Operational
Location

Dunhuang Shi
Jiuquan Shi
Gansu Sheng,
China

Lat/Long Location
40°
3'
43.70"
North
94°
25'
30.00"
East
Electricity Generation
390,000 MWh/yr
Break Ground Date
Start Production Date
PPA/Tariff Rate
1.15 ¥/kWh
Project Type
Commercial

Participants

Developer(s)
Beijing Shouhang IHW
EPC Contractor
SunCan

Plant Configuration

Solar Field

Heat-Transfer Fluid Type
Molten Salt
Heat Transfer Fluid Company
Jiaocheng Bingsheng Chemical Co. Ltd

Power Block

Turbine Capacity (Gross)
100 MW
Turbine Capacity (Net)
100 MW
Turbine Manufacturer
GE
Output Type
Steam Rankine

Thermal Storage

Storage Type
2-tank direct
Storage Capacity
11 hours
Storage Description
Molten Salt

Project Overview

Project Name: Shouhang Dunhuang 100 MW Phase II
Location: China
(Gansu Sheng)
Location: Jiuquan Shi (Gansu Sheng)
Owner(s): Beijing Shouhang IHW
Technology: Power Tower
Turbine Capacity (Net):
100 MW
Turbine Capacity (Gross):
100 MW
Status: Operational
Start Year: 2018

Do you have more information, corrections, or comments?

Download Project Data