Puerto Errado 1 Thermosolar Power Plant CSP Project

This page provides information on Puerto Errado 1 Thermosolar Power Plant CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: Puerto Errado 1 Thermosolar Power Plant
Location: Calasparra
Murcia
Región de Murcia Spain
Owners (%): Novatec Solar España S.L.
Technology Linear Fresnel
Nominal Capacity: 1.4 MW
Status Operational
Start Year: 2009

Status Date

Status Date

Background

Break Ground Date 2008
Expected Generation (GWh/year) 2
Lat/Long Location 38.278,-1.6
Total Power Station Land Area (km²) 0.05

Participants

Developer Novatec Solar GmbH
Spain, Germany
EPC Novatec Solar España S.L.
Spain
Operator Novatec Solar España S.L., Power Support
Electricity Generation Offtaker Iberdrola S.A.U., REE
Annual Operations Jobs 1

Costs

Remuneration EUR/kWh 0.27
Remuneration Start Year 2009
Remuneration USD/kWh Deflated (2020) 0.43
PPA or Tariff Period (Years) 25
Policy Support Scheme b1.2 R.D 661/2007

Plant Configuration

Solar Field

Mirror Width in Line (m) 16
# of Lines 2
Mirror Line Length (m) 806
Mirror Manufacturer Novatec Solar España S.L.
Spain

Solar Field (Receiver)

Receiver Working Fluid Water
Receiver Working Fluid Category Water
Solar Field or Receiver Inlet Temperture (C) 140°C
Solar Field or Receiver Outlet Temperture (C) 270°C
Receiver Manufacturer Novatec
Spain
Receiver Model Nova-1

Power Block

Nominal Turbine or Power Cycle Capacity 1.4 MW
Turbine Manufacturer KKK-Siemens
Germany
Power Cycle Pressure (Bar) 55
Cooling Type Dry

Thermal Energy Storage

Storage Type Single-tank thermocline
Storage Description Ruths tank

The project data on these pages and in the downloadable CSV file is copyright (©) Institute for Advanced Sustainability Studies (IASS) and others 2022; data by Lilliestam@IASS, Thonig@IASS, Zang@CAS, Gilmanova@CAS and others. The data is licensed under a Creative Commons Attribution 4.0 International License.”