Three Gorges CTGR Henderson Energy Guazhou 2x50MW Tower + 200MW PV + 400MW Wind CSP Project

This page provides information on Three Gorges CTGR Henderson Energy Guazhou 2x50MW Tower + 200MW PV + 400MW Wind CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: Three Gorges CTGR Henderson Energy Guazhou 2x50MW Tower + 200MW PV + 400MW Wind
Location: Qiaowan, Guazhou
Jiuquan
Gansu China
Owners (%): 51% Henderson New Energy Technology Co., Ltd. And China Three Gorges New Energy (Group) Co., Ltd. 49%.
Technology Wind-PV-Hybrid, Tower
Solar Resource: 1683
Nominal Capacity: 100 MW
Status Under Construction
Start Year: 2024

Status Date

Status Date

Background

Break Ground Date 2022
Lat/Long Location 40.59, 96.46

Participants

Developer Three Gorges and Hernderson Energy
China
EPC China Energy Construction Gezhouba Electric Power of CEEC
China
Electricity Generation Offtaker Gansu State Grid Electric Power

Costs

Remuneration RMB/kWh 0.31
Remuneration Start Year 2021
Remuneration USD/kWh Deflated (2020) 0.05
Support Scheme Type FIT
Policy Support Scheme Subsidy free, supported by provincial coal tariff.

Plant Configuration

Solar Field

# of Heliostats (or dishes for dish systems) 26964
Collector/Heliostat Engineering or IP Owner Hengji Nengmai
China

Solar Field (Receiver)

Receiver Working Fluid Molten Salt
Receiver Working Fluid Category Salt
Tower Height (m) 200
Receiver Manufacturer Harbin Electric Boiler
China

Power Block

Nominal Turbine or Power Cycle Capacity 100 MW
Turbine Manufacturer Harbin Electric
China
Power Cycle Steam Rankine

The project data on these pages and in the downloadable CSV file is copyright (©) Institute for Advanced Sustainability Studies (IASS) and others 2022; data by Lilliestam@IASS, Thonig@IASS, Zang@CAS, Gilmanova@CAS and others. The data is licensed under a Creative Commons Attribution 4.0 International License.”