Stillwater GeoSolar Hybrid Plant CSP Project
This page provides information on Stillwater GeoSolar Hybrid Plant CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
| Power Station: | Stillwater GeoSolar Hybrid Plant |
|---|---|
| Location: | Fallon |
| Nevada United States | |
| Owners (%): | ENEL |
| Technology | Parabolic Trough |
| Nominal Capacity: | 2 MW |
| Status | Operational |
| Start Year: | 2015 |
Status Date
| Status Date |
|---|
Background
| Break Ground Date | 2014 |
|---|---|
| Expected Generation (GWh/year) | 3 |
| Lat/Long Location | 39.548,-118.556 |
| Total Power Station Land Area (km²) | 0.08 |
Participants
| Developer |
ENEL Italy |
|---|---|
| EPC |
SkyFuel |
| Operator | Enel |
| Electricity Generation Offtaker | NV Energy |
Costs
| PPA or Tariff Period (Years) | 20 |
|---|
Plant Configuration
Solar Field
| # of Modules per SCA | 8 |
|---|---|
| SCA Aperture Area (m²) | 656 |
| SCA Length (m) | 115 |
| Collector/Heliostat Engineering or IP Owner |
SkyFuel USA |
| Collector/Heliostat Model | SkyTrough |
| Mirror Manufacturer |
ReflecTech USA |
Solar Field (Receiver)
| Receiver Working Fluid | Water |
|---|---|
| Receiver Working Fluid Category | Water |
Power Block
| Nominal Turbine or Power Cycle Capacity | 2 MW |
|---|---|
| Power Cycle | Organic Rankine |