Stillwater GeoSolar Hybrid Plant CSP Project

This page provides information on Stillwater GeoSolar Hybrid Plant CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: Stillwater GeoSolar Hybrid Plant
Location: Fallon

Nevada
United States
Owners (%): ENEL
Technology Parabolic Trough
Nominal Capacity: 2 MW
Status Operational
Start Year: 2015

Status Date

Status Date December 05, 2021

Background

Break Ground Date 2014
Expected Generation (GWh/year) 3
Lat/Long Location 39.548,-118.556
Total Power Station Land Area 0.08

Participants

Developer ENEL
Italy
EPC SkyFuel
Operator Enel
Electricity Generation Offtaker NV Energy

Costs

PPA or Tariff Period (Years) 20

Plant Configuration

Solar Field

# of Modules per SCA 8
SCA Aperture Area (m²) 656
SCA Length (m) 115
Collector/Heliostat Engineering or IP Owner SkyFuel
USA
Collector/Heliostat Model SkyTrough
Mirror Manufacturer ReflecTech
USA

Solar Field (Receiver)

Receiver Working Fluid Water
Receiver Working Fluid Category Water

Power Block

Nominal Turbine or Power Cycle Capacity 2 MW
Power Cycle Organic Rankine