Stillwater GeoSolar Hybrid Plant CSP Project
This page provides information on Stillwater GeoSolar Hybrid Plant CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
Power Station: | Stillwater GeoSolar Hybrid Plant |
---|---|
Location: | Fallon |
Nevada United States | |
Owners (%): | ENEL |
Technology | Parabolic Trough |
Nominal Capacity: | 2 MW |
Status | Operational |
Start Year: | 2015 |
Status Date
Status Date |
---|
Background
Break Ground Date | 2014 |
---|---|
Expected Generation (GWh/year) | 3 |
Lat/Long Location | 39.548,-118.556 |
Total Power Station Land Area (km²) | 0.08 |
Participants
Developer |
ENEL Italy |
---|---|
EPC |
SkyFuel |
Operator | Enel |
Electricity Generation Offtaker | NV Energy |
Costs
PPA or Tariff Period (Years) | 20 |
---|
Plant Configuration
Solar Field
# of Modules per SCA | 8 |
---|---|
SCA Aperture Area (m²) | 656 |
SCA Length (m) | 115 |
Collector/Heliostat Engineering or IP Owner |
SkyFuel USA |
Collector/Heliostat Model | SkyTrough |
Mirror Manufacturer |
ReflecTech USA |
Solar Field (Receiver)
Receiver Working Fluid | Water |
---|---|
Receiver Working Fluid Category | Water |
Power Block
Nominal Turbine or Power Cycle Capacity | 2 MW |
---|---|
Power Cycle | Organic Rankine |