Solacor 2 CSP Project

This page provides information on Solacor 2 CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: Solacor 2
Location: El Carpio
Córdoba
Andalusia Spain
Owners (%): Abengoa (76%), JGC (24%()
Technology Parabolic Trough
Solar Resource: 2042
Nominal Capacity: 50 MW
Status Operational
Start Year: 2012

Status Date

Status Date

Background

Expected Generation (GWh/year) 100
Lat/Long Location 37.957,-4.492
Total Power Station Land Area (km²) 1.1

Participants

Developer Abengoa
Spain
EPC Abener, Teyma
Spain
Operator Abengoa
Construction Job Years 450
Annual Operations Jobs 40

Costs

Total Construction Cost (2012) € 229.00 million
Total Cost USD (2020) $323.27 million
Specific Cost/kW USD (2020) $ 6465.5
LCOE USD/kWh (2020) $ 0.28
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank's GDP deflator; if station under development or construction then not deflated (assumed cost year 2020)
Remuneration EUR/kWh 0.27
Remuneration Start Year 2012
Remuneration USD/kWh Deflated (2020) 0.38
PPA or Tariff Period (Years) 25
Support Scheme Type FIT
Policy Support Scheme Real Decreto 661/2007

Plant Configuration

Solar Field

Solar Field Aperture Area (m²) 300000
# of Solar Collector Assemblies (SCAs) 360
# of Loops 90
# of SCAs per Loop 4
# of Modules per SCA 12
SCA Length (m) 150
Collector/Heliostat Manufacturer Abengoa
Spain
Collector/Heliostat Engineering or IP Owner Abengoa
Spain
Collector/Heliostat Model Astro (ET-150)

Solar Field (Receiver)

Receiver Working Fluid Thermal Oil
Receiver Working Fluid Category Thermal oil/organics
# of Heat Collector Elements (HCEs) 12960
Solar Field or Receiver Inlet Temperture (C) 293°C
Solar Field or Receiver Outlet Temperture (C) 393°C
Receiver Manufacturer Schott
Germany

Power Block

Nominal Turbine or Power Cycle Capacity 50 MW
Power Cycle Steam Rankine
Power Cycle Pressure (Bar) 100
Cooling Type Wet

The project data on these pages and in the downloadable CSV file is copyright (©) Institute for Advanced Sustainability Studies (IASS) and others 2022; data by Lilliestam@IASS, Thonig@IASS, Zang@CAS, Gilmanova@CAS and others. The data is licensed under a Creative Commons Attribution 4.0 International License.”