Power China Ruoqiang 100MW Tower + 900MW PV CSP Project
This page provides information on Power China Ruoqiang 100MW Tower + 900MW PV CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
| Power Station: | Power China Ruoqiang 100MW Tower + 900MW PV |
|---|---|
| Location: | Ruoqiang |
| Bayingolin | |
| Xinjiang (XUAR) China | |
| Technology | PV-Hybrid, Tower |
| Solar Resource: | 1767 |
| Nominal Capacity: | 100 MW |
| Status | Under Construction |
| Start Year: | 2024 |
Status Date
| Status Date |
|---|
Background
| Break Ground Date | 2022 |
|---|---|
| Lat/Long Location | 38.15, 90.11 |
| Total Power Station Land Area (km²) | 18.8 |
Participants
| Developer |
Power China China |
|---|---|
| EPC |
China Water Conservancy and Hydropower First Engineering Bureau; Jiangxi Provincial Electric Power Design Institute (JXEPDI); Sepco III of Power China China |
| Construction Job Years | 2000 |
| Annual Operations Jobs | 200 |
Costs
| Total Construction Cost (2022) | 1346.00 million | ||
|---|---|---|---|
| Total Cost USD (2020) | $200.15 million | ||
| Specific Cost/kW USD (2020) | $ 2001 | ||
| Policy Support Scheme | Subsidy free, supported by provincial coal tariff. |
Plant Configuration
Solar Field
| Solar Field Aperture Area (m²) | 600000 |
|---|---|
| # of Heliostats (or dishes for dish systems) | 12371 |
| Heliostat Aperture Area (m²) (or dish aperature for dish systems) | 48 |
| Collector/Heliostat Engineering or IP Owner |
SEPCO III China |
Solar Field (Receiver)
| Receiver Working Fluid | Molten Salt |
|---|---|
| Receiver Working Fluid Category | Salt |
Power Block
| Nominal Turbine or Power Cycle Capacity | 100 MW |
|---|
Thermal Energy Storage
| Storage Capacity (Hours) | 8 |
|---|---|
| Storage Description | Molten Salt |