Power China Ruoqiang 100MW Tower + 900MW PV CSP Project
This page provides information on Power China Ruoqiang 100MW Tower + 900MW PV CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
Power Station: | Power China Ruoqiang 100MW Tower + 900MW PV |
---|---|
Location: | Ruoqiang |
Bayingolin | |
Xinjiang (XUAR) China | |
Technology | PV-Hybrid, Tower |
Solar Resource: | 1767 |
Nominal Capacity: | 100 MW |
Status | Under Construction |
Start Year: | 2024 |
Status Date
Status Date |
---|
Background
Break Ground Date | 2022 |
---|---|
Lat/Long Location | 38.15, 90.11 |
Total Power Station Land Area (km²) | 18.8 |
Participants
Developer |
Power China China |
---|---|
EPC |
China Water Conservancy and Hydropower First Engineering Bureau; Jiangxi Provincial Electric Power Design Institute (JXEPDI); Sepco III of Power China China |
Construction Job Years | 2000 |
Annual Operations Jobs | 200 |
Costs
Total Construction Cost (2022) | 1346.00 million | ||
---|---|---|---|
Total Cost USD (2020) | $200.15 million | ||
Specific Cost/kW USD (2020) | $ 2001 | ||
Policy Support Scheme | Subsidy free, supported by provincial coal tariff. |
Plant Configuration
Solar Field
Solar Field Aperture Area (m²) | 600000 |
---|---|
# of Heliostats (or dishes for dish systems) | 12371 |
Heliostat Aperture Area (m²) (or dish aperature for dish systems) | 48 |
Collector/Heliostat Engineering or IP Owner |
SEPCO III China |
Solar Field (Receiver)
Receiver Working Fluid | Molten Salt |
---|---|
Receiver Working Fluid Category | Salt |
Power Block
Nominal Turbine or Power Cycle Capacity | 100 MW |
---|
Thermal Energy Storage
Storage Capacity (Hours) | 8 |
---|---|
Storage Description | Molten Salt |