Noor Energy 1 / DEWA IV 3x 200MW trough segment CSP Project

This page provides information on Noor Energy 1 / DEWA IV 3x 200MW trough segment CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: Noor Energy 1 / DEWA IV 3x 200MW trough segment
Location: Dubai
Dubai United Arab Emirates
Owners (%): Dubai Electricity & Water Authority
Technology Parabolic Trough
Solar Resource: 1967
Nominal Capacity: 600 MW
Status Under Construction
Start Year: 2023

Status Date

Status Date

Background

Break Ground Date 2018
Lat/Long Location 24.76,55.36

Participants

Developer ACWA, Shanghai Electric
Saudi Arabia, China
EPC Shanghai Electric
China
Operator NOMAC
Electricity Generation Offtaker Dubai Electricity & Water Authority

Plant Configuration

Solar Field

Collector/Heliostat Manufacturer Abengoa
Spain
Collector/Heliostat Engineering or IP Owner Abengoa
Spain
Collector/Heliostat Model SpaceTube 8.2
Mirror Manufacturer Rioglass
Spain
Mirror Model 8.2

Solar Field (Receiver)

Receiver Working Fluid Biphenyl/Diphenyl oxide: Dowtherm A
Receiver Working Fluid Category Thermal oil/organics
Working Fluid Manufacturer Dow
Receiver Manufacturer Rioglass
Spain
Receiver Model PTR 90-4G

Power Block

Nominal Turbine or Power Cycle Capacity 600 MW
Turbine Manufacturer Siemens
Germany
Power Cycle Steam Rankine

Thermal Energy Storage

Storage Type 2-tank indirect
Storage Capacity (Hours) 11
Storage Description Molten salt
TES Engineering Company Shanghai Lanbin Petrochemical Equipment (LANPEC Technologies Limited) China

The project data on these pages and in the downloadable CSV file is copyright (©) Institute for Advanced Sustainability Studies (IASS) and others 2022; data by Lilliestam@IASS, Thonig@IASS, Zang@CAS, Gilmanova@CAS and others. The data is licensed under a Creative Commons Attribution 4.0 International License.”