Noor Energy 1 / DEWA IV 3x 200MW Trough 1 segment CSP Project

This page provides information on Noor Energy 1 / DEWA IV 3x 200MW Trough 1 segment CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: Noor Energy 1 / DEWA IV 3x 200MW Trough 1 segment
Location: Dubai

Dubai
United Arab Emirates
Owners (%): Dubai Electricity & Water Authority
Technology Parabolic Trough
Solar Resource: 1967
Nominal Capacity: 600 MW
Status Under Construction
Start Year: 2022

Status Date

Status Date July 07, 2021

Background

Break Ground Date 2018
Lat/Long Location 24.76,55.36

Participants

Developer ACWA, Shanghai Electric
Saudi Arabia, China
EPC Shanghai Electric
China
Operator NOMAC
Electricity Generation Offtaker Dubai Electricity & Water Authority

Costs

Plant Configuration

Solar Field

Collector/Heliostat Manufacturer Abengoa
Spain
Collector/Heliostat Engineering or IP Owner Abengoa
Spain
Collector/Heliostat Model SpaceTube 8.2
Mirror Manufacturer Rioglass
Spain
Mirror Model 8.2

Solar Field (Receiver)

Receiver Working Fluid Biphenyl/Diphenyl oxide: Dowtherm A https://www.dow.com/en-us/insights-and-innovation/product-news/dow-and-shanghai-electric-collaborate-on-a-world-scale-concentrated-solar-power-project
Receiver Working Fluid Category Thermal oil/organics
Working Fluid Manufacturer Dow
Receiver Manufacturer Rioglass
Spain
Receiver Model PTR 90-4G

Power Block

Nominal Turbine or Power Cycle Capacity 600 MW
Turbine Manufacturer Siemens
Germany
Power Cycle Steam Rankine

Thermal Energy Storage

Storage Type 2-tank indirect
Storage Capacity (Hours) 11
Storage Description Molten salt
TES Engineering Company Shanghai Lanbin Petrochemical Equipment (LANPEC Technologies Limited) China