Noor Energy 1 / DEWA IV 3x 200MW trough segment CSP Project
This page provides information on Noor Energy 1 / DEWA IV 3x 200MW trough segment CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
| Power Station: | Noor Energy 1 / DEWA IV 3x 200MW trough segment |
|---|---|
| Location: | Dubai |
| Dubai United Arab Emirates | |
| Owners (%): | Dubai Electricity & Water Authority |
| Technology | Parabolic Trough |
| Solar Resource: | 1967 |
| Nominal Capacity: | 600 MW |
| Status | Under Construction |
| Start Year: | 2023 |
Status Date
| Status Date |
|---|
Background
| Break Ground Date | 2018 |
|---|---|
| Lat/Long Location | 24.76,55.36 |
Participants
| Developer |
ACWA, Shanghai Electric Saudi Arabia, China |
|---|---|
| EPC |
Shanghai Electric China |
| Operator | NOMAC |
| Electricity Generation Offtaker | Dubai Electricity & Water Authority |
Plant Configuration
Solar Field
| Collector/Heliostat Manufacturer |
Abengoa Spain |
|---|---|
| Collector/Heliostat Engineering or IP Owner |
Abengoa Spain |
| Collector/Heliostat Model | SpaceTube 8.2 |
| Mirror Manufacturer |
Rioglass Spain |
| Mirror Model | 8.2 |
Solar Field (Receiver)
| Receiver Working Fluid | Biphenyl/Diphenyl oxide: Dowtherm A |
|---|---|
| Receiver Working Fluid Category | Thermal oil/organics |
| Working Fluid Manufacturer |
Dow |
| Receiver Manufacturer |
Rioglass Spain |
| Receiver Model | PTR 90-4G |
Power Block
| Nominal Turbine or Power Cycle Capacity | 600 MW |
|---|---|
| Turbine Manufacturer |
Siemens Germany |
| Power Cycle | Steam Rankine |
Thermal Energy Storage
| Storage Type | 2-tank indirect |
|---|---|
| Storage Capacity (Hours) | 11 |
| Storage Description | Molten salt |
| TES Engineering Company | Shanghai Lanbin Petrochemical Equipment (LANPEC Technologies Limited) China |