Noor Energy 1 / DEWA IV - 100MW tower segment CSP Project
This page provides information on Noor Energy 1 / DEWA IV - 100MW tower segment CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
Power Station: | Noor Energy 1 / DEWA IV - 100MW tower segment |
---|---|
Location: | Dubai |
Dubai United Arab Emirates | |
Owners (%): | Dubai Electricity & Water Authority |
Technology | Power Tower |
Solar Resource: | 1967 |
Nominal Capacity: | 100 MW |
Status | Operational |
Start Year: | 2023 |
Status Date
Status Date |
---|
Background
Break Ground Date | 2018 |
---|---|
Lat/Long Location | 24.76,55.36 |
Participants
Developer |
ACWA, Shanghai Electric Saudi Arabia, China |
---|---|
EPC |
Shanghai Electric China |
Operator | NOMAC |
Electricity Generation Offtaker | Dubai Electricity & Water Authority |
Plant Configuration
Solar Field
# of Heliostats (or dishes for dish systems) | 70000 |
---|---|
Collector/Heliostat Engineering or IP Owner |
Brightsource USA |
Collector/Heliostat Model | LH-2.5 |
Mirror Manufacturer |
AGC Glass Japan |
Mirror Model | AGC SunMax Reflect |
Solar Field (Receiver)
Receiver Working Fluid | Molten Salt |
---|---|
Receiver Working Fluid Category | Salt |
Working Fluid Manufacturer |
BASF |
Tower Height (m) | 260 |
Receiver Manufacturer |
Cockerill, Shanghai Boiler Work Belgium, China |
Power Block
Nominal Turbine or Power Cycle Capacity | 100 MW |
---|---|
Turbine Manufacturer |
Siemens Germany |
Power Cycle | Steam Rankine |
Thermal Energy Storage
Storage Type | 2-tank direct |
---|---|
Storage Capacity (Hours) | 15 |
Storage Description | Molten salt |
TES Engineering Company | Shanghai Lanbin Petrochemical Equipment (LANPEC Technologies Limited) China |