Mojave Solar Project CSP Project

This page provides information on Mojave Solar Project CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: Mojave Solar Project
Location: Harper Dry Lake
California United States
Owners (%): Mojave Solar
Technology Parabolic Trough
Solar Resource: 2888
Nominal Capacity: 280 MW
Status Operational
Start Year: 2014

Status Date

Status Date

Background

Break Ground Date 2011
Expected Generation (GWh/year) 600
Lat/Long Location 35.017,-117.333
Total Power Station Land Area (km²) 7.1

Participants

Developer Abengoa
Spain
EPC Abener, Teyma
Spain
Electricity Generation Offtaker Pacific Gas & Electric (PG&E)
Construction Job Years 1200
Annual Operations Jobs 80

Costs

Total Construction Cost (2014) $ 1600.00 million
Total Cost USD (2020) $1701.74 million
Specific Cost/kW USD (2020) $ 6077.6
LCOE USD/kWh (2020) $ 0.24
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank's GDP deflator; if station under development or construction then not deflated (assumed cost year 2020)
Remuneration USD/kWh 0.15
Remuneration Start Year 2014
Remuneration USD/kWh Deflated (2020) 0.16
PPA or Tariff Period (Years) 25
Support Scheme Type PPA
Concessional Funding or Other Support Federal Loan Guarantee $1.2 billion, 30% investment tax credit

Plant Configuration

Solar Field

Solar Field Aperture Area (m²) 1559347
# of Modules per SCA 10
Collector/Heliostat Manufacturer Abengoa
Spain
Collector/Heliostat Engineering or IP Owner Abengoa
Spain
Collector/Heliostat Model E2
Mirror Manufacturer Rioglass
Spain

Solar Field (Receiver)

Receiver Working Fluid Biphenyl/Diphenyl oxide: Therminol VP-1
Receiver Working Fluid Category Thermal oil/organics
Working Fluid Manufacturer Eastman/Solutia
Receiver Manufacturer Schott
Germany
Receiver Model PTR 70

Power Block

Nominal Turbine or Power Cycle Capacity 280 MW
Turbine Manufacturer GE
USA
Power Cycle Steam Rankine
Cooling Type Wet

The project data on these pages and in the downloadable CSV file is copyright (©) Institute for Advanced Sustainability Studies (IASS) and others 2022; data by Lilliestam@IASS, Thonig@IASS, Zang@CAS, Gilmanova@CAS and others. The data is licensed under a Creative Commons Attribution 4.0 International License.”