ISCC Duba 1 CSP Project

This page provides information on ISCC Duba 1 CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: ISCC Duba 1
Location: Duba
Tabuk Saudi Arabia
Owners (%): Saudi Electriciy Company
Technology Hybrid, Parabolic Trough
Solar Resource: 2469
Nominal Capacity: 43 MW
Status Under Construction
Start Year: 2023

Status Date

Status Date October 21, 2022

Background

Break Ground Date 2016
Lat/Long Location 27.7486,35.451

Participants

Developer Saudi Electriciy Company
Saudi Arabia
EPC Initec Energia; Saudi Services For Electro Mchanic Works
Spain; Saudi Arabia
Electricity Generation Offtaker Saudi Electricity Co.

Plant Configuration

Solar Field

Collector/Heliostat Engineering or IP Owner SBP
Germany
Collector/Heliostat Model Ultimate Trough
Mirror Manufacturer Flabeg
Germany

Solar Field (Receiver)

Receiver Working Fluid Thermal Oil
Receiver Working Fluid Category Thermal oil/organics
Receiver Manufacturer Archimede Solar Energy
Italy

Power Block

Nominal Turbine or Power Cycle Capacity 43 MW
Power Cycle Steam Rankine

The project data on these pages and in the downloadable CSV file is copyright (©) Institute for Advanced Sustainability Studies (IASS) and others 2022; data by Lilliestam@IASS, Thonig@IASS, Zang@CAS, Gilmanova@CAS and others. The data is licensed under a Creative Commons Attribution 4.0 International License.”