ISCC Duba 1 CSP Project

This page provides information on ISCC Duba 1 CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Project Overview

Power Station: ISCC Duba 1
Location: Duba

Tabuk
Saudi Arabia
Owners (%): Saudi Electriciy Company
Technology Hybrid, Parabolic Trough
Solar Resource: 2469
Nominal Capacity: 43 MW
Status Operational
Start Year: 2019

Status Date

Status Date July 07, 2021

Background

Break Ground Date 2016
Lat/Long Location 27.363,35.663

Participants

Developer Saudi Electriciy Company
Saudi Arabia
EPC Initec Energia; Saudi Services For Electro Mchanic Works
Spain; Saudi Arabia
Electricity Generation Offtaker Saudi Electricity Co.

Costs

Plant Configuration

Solar Field

Collector/Heliostat Engineering or IP Owner SBP
Germany
Collector/Heliostat Model Ultimate Trough
Mirror Manufacturer Flabeg
Germany

Solar Field (Receiver)

Receiver Working Fluid Thermal Oil
Receiver Working Fluid Category Thermal oil/organics
Receiver Manufacturer Archimede Solar Energy
Italy

Power Block

Nominal Turbine or Power Cycle Capacity 43 MW
Power Cycle Steam Rankine