Power Station: Helioenergy 1
Location: Écija
Sevilla
Andalusia Spain
Owners (%): Abengoa, Eon
Technology Parabolic Trough
Solar Resource: 2159
Nominal Capacity: 50 MW
Status Operational
Start Year: 2011

Status Date

Status Date

Background

Expected Generation (GWh/year) 95
Lat/Long Location 37.582,-5.116
Total Power Station Land Area (km²) 1.1

Participants

Developer Abengoa Solar, EON
Spain
EPC Abener, Teyma
Spain
Operator Abengoa, EON
Construction Job Years 600
Annual Operations Jobs 60

Costs

Total Construction Cost (2011) € 240.00 million
Total Cost USD (2020) $373.76 million
Specific Cost/kW USD (2020) $ 7475.2
LCOE USD/kWh (2020) $ 0.34
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank's GDP deflator; if station under development or construction then not deflated (assumed cost year 2020)
Remuneration EUR/kWh 0.27
Remuneration Start Year 2011
Remuneration USD/kWh Deflated (2020) 0.42
PPA or Tariff Period (Years) 25
Support Scheme Type FIT
Policy Support Scheme Real Decreto 661/2007

Plant Configuration

Solar Field

Solar Field Aperture Area (m²) 300000
# of Solar Collector Assemblies (SCAs) 360
# of Loops 90
# of SCAs per Loop 4
# of Modules per SCA 12
SCA Length (m) 150
Collector/Heliostat Manufacturer Abengoa
Spain
Collector/Heliostat Engineering or IP Owner Abengoa
Spain
Collector/Heliostat Model Astro (ET-150)

Solar Field (Receiver)

Receiver Working Fluid Thermal Oil
Receiver Working Fluid Category Thermal oil/organics
# of Heat Collector Elements (HCEs) 12960
Solar Field or Receiver Inlet Temperture (C) 293°C
Solar Field or Receiver Outlet Temperture (C) 393°C
Receiver Manufacturer Schott
Germany

Power Block

Nominal Turbine or Power Cycle Capacity 50 MW
Turbine Manufacturer Siemens
Germany
Turbine Model SST-700
Power Cycle Steam Rankine
Power Cycle Pressure (Bar) 100
Cooling Type Wet

The project data on these pages and in the downloadable CSV file is copyright (©) Institute for Advanced Sustainability Studies (IASS) and others 2022; data by Lilliestam@IASS, Thonig@IASS, Zang@CAS, Gilmanova@CAS and others. The data is licensed under a Creative Commons Attribution 4.0 International License.”