Generation 3 Particle Pilot Plant Saudi CSP Project
This page provides information on Generation 3 Particle Pilot Plant Saudi CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
Power Station: | Generation 3 Particle Pilot Plant Saudi |
---|---|
Location: | Waad Al-Shamal |
Saudi Arabia Saudi Arabia | |
Owners (%): | Saudi Elecricity Company |
Technology | Power Tower |
Solar Resource: | 2592 |
Nominal Capacity: | 2 MW |
Status | Under Construction |
Start Year: | 2026 |
Status Date
Status Date |
---|
Background
Break Ground Date | 2023 |
---|---|
Expected Generation (GWh/year) | 6 |
Lat/Long Location | 31.66,38.86 |
Total Power Station Land Area (km²) | 0.085 |
Participants
Developer |
Saudi Elecricity Company KSA |
---|---|
Operator | Saudi Elecricity Company |
Electricity Generation Offtaker | Waad Al-Shama ISCC |
Costs
Total Construction Cost (2023) | $ 18.00 million | ||
---|---|---|---|
Policy Support Scheme | R&D funds by SEC, KACARE, and DOE SETO |
Plant Configuration
Solar Field
Solar Field Aperture Area (m²) | 16000 |
---|
Solar Field (Receiver)
Receiver Working Fluid | White Sand |
---|---|
Receiver Working Fluid Category | Particle |
Working Fluid Manufacturer |
Nature |
Tower Height (m) | 52 |
Solar Field or Receiver Inlet Temperture (C) | 580°C |
Solar Field or Receiver Outlet Temperture (C) | 1050°C |
Receiver Model | Obstructed flow |
Power Block
Nominal Turbine or Power Cycle Capacity | 2 MW |
---|---|
Turbine Manufacturer |
Siemens Germany |
Turbine Model | SGT-50 |
Power Cycle | Air Brayton |
Power Cycle Pressure (Bar) | 8 |
Turbine Efficiency Percent | 26 |
Steam Generator System Manufacturer |
Solex thermal science Canada |
Thermal Energy Storage
Storage Type | Sensible |
---|---|
Storage Capacity (Hours) | 6 |
Storage Description | Thermal energy stoarge bin using Soild particle |
TES Engineering Company | King Saud University KSA |