Dhursar CSP Project
This page provides information on Dhursar CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
Power Station: | Dhursar |
---|---|
Location: | Dhursar |
Rajasthan India | |
Owners (%): | Reliance power |
Technology | Linear Fresnel |
Solar Resource: | 1742 |
Nominal Capacity: | 125 MW |
Status | Operational |
Start Year: | 2014 |
Status Date
Status Date |
---|
Background
Expected Generation (GWh/year) | 280 |
---|---|
Lat/Long Location | 26.786,72.008 |
Total Power Station Land Area (km²) | 3.4 |
Participants
Developer |
Rajasthjan Sun Technique Energy, Areva India, France |
---|---|
EPC |
Areva France |
Electricity Generation Offtaker | NTPC Vidyut Vyapar Nigam |
Costs
Total Construction Cost (2014) | 21000.00 million | ||
---|---|---|---|
Total Cost USD (2020) | $366.24 million | ||
Specific Cost/kW USD (2020) | $ 2929.9 | ||
LCOE USD/kWh (2020) | $ 0.11 | ||
Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank's GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |||
Remuneration INR/kWh | 11.97 | ||
Remuneration Start Year | 2014 | ||
Remuneration USD/kWh Deflated (2020) | 0.21 | ||
PPA or Tariff Period (Years) | 25 | ||
Support Scheme Type | PPA | ||
Concessional Funding or Other Support | Asian Development Bank $103 million; also from FMO (Dutch development bank) |
Plant Configuration
Solar Field
# of Lines | 0 |
---|---|
Collector/Heliostat Engineering or IP Owner |
Areva Solar USA |
Solar Field (Receiver)
Receiver Working Fluid | Water/Steam http://oa.upm.es/23011/1/INVE_MEM_2013_151623.pdf |
---|---|
Receiver Working Fluid Category | Water |
Power Block
Nominal Turbine or Power Cycle Capacity | 125 MW |
---|---|
Power Cycle | Steam Rankine |
Cooling Type | Wet |