Badaling Dahan 1 MW Tower CSP Project
This page provides information on Badaling Dahan 1 MW Tower CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
| Power Station: | Badaling Dahan 1 MW Tower |
|---|---|
| Location: | Badaling |
| Yanqing | |
| Beijing China | |
| Owners (%): | Institute of Electrical Engineering of CAS |
| Technology | Power Tower |
| Solar Resource: | 1290 |
| Nominal Capacity: | 1 MW |
| Status | Operational |
| Start Year: | 2012 |
Status Date
| Status Date |
|---|
Background
| Break Ground Date | 2009 |
|---|---|
| Expected Generation (GWh/year) | 1.9 |
| Lat/Long Location | 40.382,115.938 |
| Total Power Station Land Area (km²) | 0.05 |
Participants
| Developer |
Institute of Electrical Engineering of CAS China |
|---|---|
| EPC |
Institute of Electrical Engineering of CAS China |
| Operator | Institute of Electrical Engineering of Chinese Academy of Sciences |
Costs
| Policy Support Scheme | “11th Five-Year plan" (863 program) |
|---|
Plant Configuration
Solar Field
| Solar Field Aperture Area (m²) | 10000 |
|---|---|
| # of Heliostats (or dishes for dish systems) | 100 |
| Heliostat Aperture Area (m²) (or dish aperature for dish systems) | 100 |
| Collector/Heliostat Manufacturer |
Himin Solar China |
| Collector/Heliostat Engineering or IP Owner |
Himin Solar China |
| Mirror Manufacturer |
Taishan Huayue China |
Solar Field (Receiver)
| Receiver Working Fluid | Water |
|---|---|
| Receiver Working Fluid Category | Water |
| Tower Height (m) | 118 |
| Receiver Manufacturer |
Dongfang China |
| Receiver Model | Cavity Receiver (5x5 m) |
Power Block
| Nominal Turbine or Power Cycle Capacity | 1 MW |
|---|---|
| Turbine Manufacturer |
Hangzhou Steam Turbine Company China |
| Power Cycle | Steam Rankine |
| Cooling Type | Wet (Closed water) |
Thermal Energy Storage
| Storage Type | Other |
|---|---|
| Storage Capacity (Hours) | 1 |
| Storage Description | Two stages: saturated steam/oil |