Olivenza 1 CSP Project
This page provides information on Olivenza 1 CSP project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Project Overview
| Power Station: | Olivenza 1 |
|---|---|
| Location: | Olivenza |
| Badajoz | |
| Extremadura Spain | |
| Owners (%): | Ibereolica |
| Technology | Parabolic Trough |
| Solar Resource: | 2053 |
| Nominal Capacity: | 50 MW |
| Status | Operational |
| Start Year: | 2012 |
Status Date
| Status Date |
|---|
Background
| Break Ground Date | 2010 |
|---|---|
| Expected Generation (GWh/year) | 100 |
| Lat/Long Location | 38.81,-7.059 |
| Total Power Station Land Area (km²) | 1.6 |
Participants
| Developer |
Ibereolica Spain |
|---|---|
| EPC |
Acciona, Seridom Spain |
| Electricity Generation Offtaker | Endesa |
| Construction Job Years | 600 |
| Annual Operations Jobs | 45 |
Costs
| Total Construction Cost (2012) | € 284.00 million | ||
|---|---|---|---|
| Total Cost USD (2020) | $400.92 million | ||
| Specific Cost/kW USD (2020) | $ 8018.3 | ||
| LCOE USD/kWh (2020) | $ 0.34 | ||
| Levelised cost of electricity with 5% weighted average cost of capital and a 25 year payback period, capacity dependent O&M (1.5% of investment cost per year), deflated from Year_operational using the Worldbank's GDP deflator; if station under development or construction then not deflated (assumed cost year 2020) | |||
| Remuneration EUR/kWh | 0.27 | ||
| Remuneration Start Year | 2012 | ||
| Remuneration USD/kWh Deflated (2020) | 0.38 | ||
| PPA or Tariff Period (Years) | 25 | ||
| Support Scheme Type | FIT | ||
| Policy Support Scheme | Real Decreto 661/2007 | ||
Plant Configuration
Solar Field
| Solar Field Aperture Area (m²) | 402210 |
|---|---|
| # of Solar Collector Assemblies (SCAs) | 738 |
| # of Loops | 123 |
| # of SCAs per Loop | 6 |
| SCA Aperture Area (m²) | 545 |
| SCA Length (m) | 96 |
| Collector/Heliostat Manufacturer |
Siemens Germany |
| Collector/Heliostat Engineering or IP Owner |
Solel Israel |
| Collector/Heliostat Model | SunField 6 |
| Mirror Manufacturer |
Saint Gobain France |
Solar Field (Receiver)
| Receiver Working Fluid | Thermal Oil |
|---|---|
| Receiver Working Fluid Category | Thermal oil/organics |
| # of Heat Collector Elements (HCEs) | 17712 |
| Solar Field or Receiver Inlet Temperture (C) | 293°C |
| Solar Field or Receiver Outlet Temperture (C) | 393°C |
| Receiver Manufacturer |
Siemens Germany |
| Receiver Model | UVAC-2010 |
Power Block
| Nominal Turbine or Power Cycle Capacity | 50 MW |
|---|---|
| Turbine Manufacturer |
Siemens Germany |
| Power Cycle | Steam Rankine |
| Power Cycle Pressure (Bar) | 100 |
| Cooling Type | Wet |