Nevada Solar One

This page provides information on Nevada Solar One, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.

Acciona Energy's Nevada Solar One is the third largest CSP plant in the world and the first plant built in the United States since 1999. Located in Boulder City, Nevada, about 40 miles southeast of Las Vegas, this parabolic trough system has been operating since June 2007. The US$260 million plant has a nominal production capacity of 64 megawatts with a maximum capacity of 70 megawatts. All of the plant’s electricity, which can power more than 14,000 households annually, is being sold to Nevada Energy under a long-term power purchase agreement.
Status Date

Background

Technology
Parabolic Trough
Status
Operational
Location

Boulder City, NV
United States

County
Clark
Lat/Long Location
35°
48'
0.00"
North
114°
59'
0.00"
West
Land Area
400 acres
Solar Resource
2606 kWh/m2/yr
Source of Solar Resource
Las Vegas TMY2 Data
Electricity Generation
134,000 MWh/yr Expected/Planned
Break Ground Date
Start Production Date
Cost (approx)
266,000,000 USD
Construction Job-Years
350
Annual O&M Jobs
30
PPA/Tariff Period
20 years
Incentives
30% Federal Investment Tax Credit (ITC, 5-year MACRS)

Participants

Developer(s)
Acciona Solar Power
EPC Contractor
Lauren Engineering
Operator(s)
Acciona Solar Power
Generation Offtaker(s)
NV Energy

Plant Configuration

Solar Field

Solar-Field Aperture Area
357,200 m²
# of Solar Collector Assemblies (SCAs)
760
# of SCAs per Loop
8
SCA Aperture Area
470 m²
SCA Length
100 m
SCA Manufacturer (Model)
Acciona Solar Power (SGX-2)
Mirror Manufacturer
Flabeg
HCE Manufacturer
Schott/Solel
# of Heat Collector Elements (HCEs)
18,240
Heat-Transfer Fluid Type
DOWTHERM A
Solar-Field Inlet Temp
318ºC
Solar-Field Outlet Temp
393ºC
Solar-Field Temp Difference
75ºC
Heat Transfer Fluid Company
Dow Chemical

Power Block

Turbine Capacity (Gross)
75 MW
Turbine Capacity (Net)
72 MW
Cooling Method
Wet cooling
Storage Capacity
0.5 hour(s)
Storage Description
0.5 hours full-load storage
Photo of rows of parabolic troughs from a low aerial perspective. Several sections of up to 20 rows of long troughs are segmented by access roads.

Project Overview

Project Name: Nevada Solar One (NSO)
Location: United States
(NV)
Location: Boulder City (NV)
Owner(s) (%): Acciona Energía (100%)
Technology: Parabolic Trough
Turbine Capacity (Net):
72 MW
Turbine Capacity (Gross):
75 MW
Status: Operational
Start Year: 2007

Do you have more information, corrections, or comments?