Morón

This page provides information on Morón, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration.
Status Date

Background

Technology
Parabolic Trough
Status
Operational
Location

Morón de la Frontera
Spain

Region
Seville
Lat/Long Location
37°
8'
23.00"
North
28'
16.00"
West
Land Area
160 hectares
Electricity Generation
100,000 MWh/yr Estimated
Start Production Date
Cost (approx)
295,000,000 Euros
Construction Job-Years
600
Annual O&M Jobs
45
PPA/Tariff Type
Real Decreto 661/2007
PPA/Tariff Rate
27 Euro cents per kWh
PPA/Tariff Period
25 years
PPA/Tariff Information
Feed-in tariff
Project Type
Commercial

Participants

Developer(s)
Ibereólica Solar
EPC Contractor
Acciona/Seridom
Generation Offtaker(s)
Endesa

Plant Configuration

Solar Field

Solar-Field Aperture Area
380,000 m²
# of Solar Collector Assemblies (SCAs)
464
# of Loops
116
# of SCAs per Loop
4
Heat-Transfer Fluid Type
Thermal Oil
Solar-Field Inlet Temp
293ºC
Solar-Field Outlet Temp
393ºC
Solar-Field Temp Difference
100ºC

Power Block

Turbine Capacity (Gross)
50 MW
Turbine Capacity (Net)
50 MW
Turbine Manufacturer
Siemens
Turbine Description
5 extractions
Output Type
Steam Rankine
Power Cycle Pressure
100 bar
Cooling Method Description
Cooling Towers

Thermal Storage

Storage Type
None

Project Overview

Project Name: Morón
Location: Spain
Owner(s) (%): Grupo T-Solar (100%)
Technology: Parabolic Trough
Turbine Capacity (Net):
50 MW
Turbine Capacity (Gross):
50 MW
Status: Operational
Start Year: 2012

Do you have more information, corrections, or comments?

Download Project Data